Hey guys: I have a 51 apache 20 stepside with the 3:56 rear end, torsion bars up front. I have access to an 82 chevy blazer 4x4. How much work is involved in putting both axles from the 82 blazer on to the 61. Can it even be done? I really need some good advice on this. Thanks for all your input.